Structure for JIRA: Ideas

Thank you for visiting our feedback website! Feel free to vote or post your own ideas. Make sure you turn on the option to notify you about changes and comments in your account settings, so that you can stay updated about the progress of the ideas you’re interested in.

I suggest Structure should ...

You've used all your votes and won't be able to post a new idea, but you can still search and comment on existing ideas.

There are two ways to get more votes:

  • When an admin closes an idea you've voted on, you'll get your votes back from that idea.
  • You can remove your votes from an open idea you support.
  • To see ideas you have already voted on, select the "My feedback" filter and select "My open ideas".
(thinking…)

Enter your idea and we'll search to see if someone has already suggested it.

If a similar idea already exists, you can support and comment on it.

If it doesn't exist, you can post your idea so others can support it.

Enter your idea and we'll search to see if someone has already suggested it.

  1. Allow re-formatting aggregated time fields (e.g. into hours).

    We are budgeting a project - so we need to show a rollup of hours and then an extension of these hours into costs.

    So we need to be able to:
    a) format time so that it doesn't simplify 60 hours spread over in a year into 1w 2d 4h - it needs to show as "60 hours"
    b) provide a column that does math on the 60 hours. e.g. 60 hours at $125/hr = $7500

    Together we will rid organisational planning of excel :)

    M.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    planned  ·  3 comments  ·  Flag idea as inappropriate…  ·  Admin →
  2. Auto-Convert Perspective-Link into Structure-Gadget on Confluence-Pages

    In this way one is able to create whatever view of the Structure in the structure itself and share this on Confluence pages without dealing with the UI of the gadget (which needs some improvements).

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  3. Combine multiple filters for synchronization

    Say I have two members in a structure, Epic1 and Epic2. I created two filters, Epic1 Resolved Bugs, and Epic2 Resolved Bugs, and created synchonized filters accordingly. Now I see all the Epic1 resolved bugs under Epic1, and Epic2 resolvedbugs under Epic2, as expected. Now I just want to see resolved bugs fixed at a certain version. I'll have to edit each filter to accomplish this. It'd be nice if I can AND a "Fixed by VersionX" filter to ALL the filters, and then just change this filter everytime.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    3 comments  ·  Flag idea as inappropriate…  ·  Admin →
  4. Structure subscription

    I have been searching for an option to subscribe to a structure (similar to a filter). If this is not available, it might be a good idea to add this as some of the structures cannot be created using filters.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    2 comments  ·  Structure  ·  Flag idea as inappropriate…  ·  Admin →
  5. 1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  0 comments  ·  Flag idea as inappropriate…  ·  Admin →
  6. When due date is set, automatically calculate remaining estimate and turn on time tracking

    If an issue has a Due Date, calculate automatically days to complete and set that value as a Remaining Estimate, and turn on Time Tracking automatically.

    ---

    При установке срока задачи сделать возможность автоматического учета рабочего времени

    Если в задаче установлен срок то автоматически высчитывать сколько времени в днях она займет и выставлять в поле планируемое время это значение и автоматически включать учет времени.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  7. Allow me to include explanatory text

    I build Structures for people to look at. There is always a type of interpretation I need them to make.

    So, I need the ability to put at the top and bottom of the page an explanation of what they are looking at and how they should read it.

    For instance, on a budget, to say "this sum of Remaining Estimate field is shown as 1w1d5h but should be interpreted as X hours; Export to Excel, total the field and multiply by our hourly rate * 24/8 for a billing number"

    Else people land on the screen and say "so…

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  8. Hide the days and unworkable hours of the gantt grid. Especially when it is extended to the maximum (hours)

    When the maximum detailing of the gantt chart is done, the days and hours that do not end up representing a greater amount of columns in the gantt. It would be much more practical with great visualization without these columns. Especially when there is a need to visualize tasks that are defined with small loads of hours and to be executed on the same day.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    6 comments  ·  Gantt  ·  Flag idea as inappropriate…  ·  Admin →
  9. Reorganize the ManageStructure page

    - allow us to specify a short name for each synchronizer
    - move the items which appear once per structure, i.e., Name, Owner, Access, Popularity, Operations, out of the table to a header, so that the information in the Sync With column could be expanded: this would allow more room so that the Sychronizer Short Name could be displayed, and the type of synchronizer would not line-wrap.
    Thanks !

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    planned  ·  2 comments  ·  Flag idea as inappropriate…  ·  Admin →
  10. number of comments

    Add a count of the number of comments.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Structure  ·  Flag idea as inappropriate…  ·  Admin →
  11. Please add Expr function to return number of working days between 2 dates or in general work with Calendars defined in Gantt

    Hi Almworks,

    We need very simple capacity management in Structure. For this to work we have almost everything:
    - ability to aggregate from tasks to Epics (and higher levels) for remaining estimates and spent
    - Top-level group can act as a teams, for which we can defined daily capacity and planned work ratio (using field with CASE() for example)

    What we lack is we can't calculate remaining capacity considering resources availability, mostly because we can't use production calendars (similar to NETWORKDAYS() of Excel) If we had this ability we could automatically build Structure view which shows current remaining estimates vs.…

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Structure  ·  Flag idea as inappropriate…  ·  Admin →
  12. Let user to zoom in and focus on just one hierarchy level

    One of the features that makes Workflowy so great, is the possibility to zoom-in to one hierarchy level only. I think this could work for Structure as well.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  13. Integration on Jira Agile

    It's very useful the integration with Jira Agile (on Jira 6 and next releases), so I can see near the tab Epic and Version (in the backlog view) also the other structure that I can build.
    Actually, I have to manage two different views: Structure view and Backlog view. It's better to integrate this two views.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  14. 1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  15. Folder metadata

    It would be useful to have folder metadata. There are many uses for this but at a high level you could definitely folder types (strategic vs. operational), provide folder owners etc.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  16. Structure lite

    Have you ever thought about a lite version of structure with reduced functionality? e.g. only supporting parent / subtask or epic / story relations or homogenous link hierarchies for example.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  17. Retain hyperlinks when printing a Printable to a PDF

    The Excel report retains hyperlinks back to the issues. The preview of the printable also does, but these are lost when printing to an actual PDF.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    2 comments  ·  Flag idea as inappropriate…  ·  Admin →
  18. Regular Expression Text Function for substring extraction

    A regular express text function would be very useful to extract content from a Text field into a column.

    For example, if a Description field has:

    Name: Value
    Name1: Value2

    I can write a regex formula to extract out the value for Name: into a Column.

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Structure  ·  Flag idea as inappropriate…  ·  Admin →
  19. Make scheduled auto-resync with filters

    For adding / deleting issues from the filter in background mode

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    planned  ·  1 comment  ·  Flag idea as inappropriate…  ·  Admin →
  20. Allow modification of Jira issues order/links in directly in Structure for Cloud

    Currently when using automation to bring in issues and show the linked status they is no ability to update order or the link between other issues. Ideally issues could be reordered to identify priority or possibly even have their links modified when dragged to other hierarchies (similar to the status being changes when dragged on a KanBan Board)

    1 vote
    Vote
    Sign in
    (thinking…)
    Sign in with: facebook google
    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Structure Cloud  ·  Flag idea as inappropriate…  ·  Admin →
  • Don't see your idea?

Structure for JIRA: Ideas

Feedback and Knowledge Base