Show Calculated Estimated and Remaining Times on Structure Board
Currently, the Structure Board shows the Progress calculated from the roll-ups of the estimated times and remaining times, these should also be available as columns in the board.
13
votes
AdamM
shared this idea
Available in version 1.4