Skip to content

Structure for JIRA: Ideas

Thank you for visiting our feedback website! Feel free to vote or post your own ideas. Make sure you turn on the option to notify you about changes and comments in your account settings, so that you can stay updated about the progress of the ideas you’re interested in.

118 results found

  1. 4 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Have option to customize or hide what buttons are shown

    Trying to get users to update information who are less familiar with Jira. Want to customize what options/buttons users see so it's less overwhelming.

    5 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Structure  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. be able to export to .xlsx (xlsx-Format, MS Excel 2016 and higher)

    Our users like to export their structures to .xlsx to use the full functionality of modern Excel.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    accepted  ·  1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Allow for shared filters similar to how views are managed

    Similar to how views can be shared across different Structures, it would be great if Quick Transformations could be the same. Right now, we have 15+ separate, but related Structures. All should have consistent views and transformations. Managing views is very simple, but if you change a filter on one Structure, you must replicate that change X more times.

    5 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Structure  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Add Project Category

    Structure recently added the ability to use "Status Category" as a column. As Categories can be pretty powerful tools, I would like to suggest bringing "Project Category" in as a column as well.

    In addition to columns, the bigger need I have at the moment is to be able to "Group by" Project Category in the Automation options. I also noticed that Status Category is missing here as well, so I think it would be great to bring the existing work to the Automation section as well.

    4 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Structure  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Progress by status category

    Currently progress by status is supported(among other statuses).

    To simplify configuration in complicated jira setups it would be nice if one could filter by status category. Instead or in combination.

    5 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Export Resource usage to excel, to generate shareable reports

    I'd like to be able to share resource usage information with people not using jira.
    Export to excel of the resource usage table could be useful.
    Graphical and printable representations of table also could be useful.

    2 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Gantt  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    accepted  ·  Alexey Pegov responded

    Hi Andrea! An export of Resource allocation is planned to be done in one of upcoming versions. Thank you for feedback!

  8. Implement a 'Progress Bar' for the structures while they're uploading

    Currently, there are no indicators of how long will it take to show up a structure and the 'spinning wheel' is showing up to several minutes (while uploading/reindexing a large number of tickets.
    The progress bar will help to determine that the 'work in progress' and there are no issues/hangs during this process.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    accepted  ·  0 comments  ·  Structure Cloud  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. removing a column sort is not easy. Make it simple.

    Structure is sorted by Rank (through automation). I often click on Assignee column to sort by it. The only way to remove the sort is to click Transformation, Click the sort and click the remove. This is way too many steps to just remove a sort. One idea is to have each column have 3 states when clicked. Sort Ascending, Sort descending, Remove sort.

    6 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Structure  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. start date

    As a team lead, I want the Gantt view to show all unresolved issues as starting in the future irrespective of the view's "start date", so I can quickly visualise dependencies between teams that will impact their next sprint

    5 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Gantt  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    accepted  ·  Alexey Pegov responded

    Hi Robert, thank you for the request! This feature is called a Backlog and planned to be available in one of upcoming releases!

  11. Allow referencing a formula based Structure column within S-JQL expression

    Currently, I can only refer real fields of a JIRA issue within S-JQL function structureQuery parameter.

    Example: "issue in structure("Planned Stories", "issueOrAncestor in [type = Epic and status = Open]")"

    But it will be absurdly powerful if I could refer to a formula based Structure column values, existing in a selected View in e.g. such way:

    issue in structure("Planned Stories Structure","Planned Stories View", "issueOrAncestor in [type = Epic and 'Adjusted Storypoints' > 'Planned StoryPoints']")

    11 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    accepted  ·  1 comment  ·  Structure  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Export to Google Sheets

    Make it possible to directly export a structure into Google Sheets. It will save one step converting an Excel file into Google Sheets.

    10 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    accepted  ·  0 comments  ·  Structure Cloud  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Add "Basic" search feature as an alternative to JQL

    For users who are not well versed in JQL, it would be nice to have the ability to add Jira filters in a way that is comparable to Jira's "Basic" search feature, rather than by inputting the JQL manually.

    Perhaps, on the dialog that is displayed when the user adds a JQL insert automation for the first time, we could have a "Basic" link that converts the query to the basic view, just like Jira's issue navigator. Then, all the JQL would be converted into a series of UI inputs (user pickers, drop-downs, etc).

    In addition to this, it would…

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    accepted  ·  2 comments  ·  Structure  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Allow quick transformations from Gadget

    Hello,

    I am in love with structure. Thank you so much for making it!

    Would it be possible to put the Quick Transformations in the Dashboard Gadget in Jira?

    Thank you!

    7 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Structure  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Regular Expression Text Function for substring extraction

    A regular express text function would be very useful to extract content from a Text field into a column.

    For example, if a Description field has:

    Name: Value
    Name1: Value2

    I can write a regex formula to extract out the value for Name: into a Column.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    6 comments  ·  Structure  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Artifical task as from BigGant

    Hi, I thing something as Artifical Tasks from BigGang should be handy. We can´t planning far for future. In many times we need plan work which we did´t have fragmented to tasks. There is only highlevel overview that Member1 will have work on Project1 on week35 - week37 than on Project2 on week38-39 and etc. We need tasks which is not under project and created as Jira task, but only as shadow task significant than Person will be on Project. Folders can only group tasks but doesn´t have start date and end date.

    33 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Gantt  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    accepted  ·  Alexey Pegov responded

    Hi!

    Indeed that would be a good addition! We’ll definitely do something like this!

    Thanks for your feedback!

  17. As a gantt user, I would like to get my fix versions as milestones

    As a gantt user, I would like to get my the release date of my versions automatically projected as milestones on the timeline, so that when I bind a task to it, it automatically update the fix version/s field.

    11 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    2 comments  ·  Gantt  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. number of comments

    Add a count of the number of comments.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Structure  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Show additional information on the ressources panel

    The ressource panel only indicates the ressource name. For supporting scheduling It would be very helpful to have more information directly in the ressource panel, e.g. "Units", used calendar and a marker or counter that x availability periods are aligned to the respective resource.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Gantt  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    accepted  ·  Alexey Pegov responded

    Hi!

    Thank you for a suggestion. Showing more info is indeed a good idea and it is actually planned.

  20. have a aggregation modifier #fromTopToMe #fromBottomToMe

    To provide a backlog forecast it is essential to show what content could be done within a certain time or time budget. If we configure the budget in a top level issues custom field, structure could SUM not only by level, but also the contents of the current list of elements (eg. by priority) and a formula could show from which element the budget is overspent.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    accepted  ·  7 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?

Structure for JIRA: Ideas

Categories

Feedback and Knowledge Base