Structure for JIRA: Ideas
Thank you for visiting our feedback website! Feel free to vote or post your own ideas. Make sure you turn on the option to notify you about changes and comments in your account settings, so that you can stay updated about the progress of the ideas you’re interested in.
158 results found
-
when auto scheduling in gantt, have start and finish dates synced with a field in issue.
when auto scheduling in gantt, start and finish dates are not synced with Start Date and End Date of the issue and later when generating reports, we cant have a realistic report
5 votesHello Zarei!
Starting from Structure.Gantt 2.3 it is now possible to sync Gantt start and finish dates back into Jira.
See more details in Structure.Gantt 2.3 Release Notes: https://wiki.almworks.com/x/4IAUBQ
More Gantt attributes will be available within Structure.Gantt 2.4 update (scheduled to be released in April 2020)
-
Provide a Gantt Gadget Timeline View
It would be great to embed the gantt view inside a Confluence page as a timeline view.
2 votesThis feature is now available as a part of Structure.Gantt 1.2.0 release.
-
Filter work log author using groups
We can currently use the "Work Logged" column and specify an individual user to see his or her work log.
It would be very useful if we could have the option to specify a group instead of a user, and see all time logged by any member of that group.
For clarity, we'd like this in addition to the current functionality rather than replacing what's there.
3 votes -
Separate Effort from Duration. Gantt should show the duration independent from the effort estimation.
Duration depends of the availability of resources. Gantt should show how long the issue will take to close, For Stories the duration is given by the sprint. For Epics there is no possibility to hold this information and show it in the Gantt, using the Effort field for this information is completely the wrong way.
3 votesWith the release of Structure.Gantt 1.4 it is now possible to enter Effort and duration independently. Please, see https://wiki.almworks.com/x/C7W9Aw for more details
-
Allow reordering of the quick transition filters
When you need to add a new quick transition and save it as a quick transition, there is no option to drop and drag this new transition into the current order. We are trying to keep our quick transitions in alphabetical order to make it easier to navigate, this isn't currently possible.
3 votesThank you! please check the comment
-
Provide start and end date / time in custom fields and automatically updated taking in consideration the work schedule, estimated real time
These fields are of extreme importance for time management throughout the project.
1 vote -
Horizontal scrollbar in structures and views
If the view has many columns it is very hard to see what the values in the columns are. Horizontal scroll-bar is needed.
1 vote -
Support dependency offsets
As a project planner I need to be able to define a dependency with an offset.
Example: Task 5 can start 3 days after Task 4 starts. I would define that as a Start-to-start dependency from Task 5 on Task 4 with a +3 day offset.5 votesHello!
Starting from version 2.2 Structure.Gantt has dependency lag/lead time support!
More details here: https://wiki.almworks.com/x/bQHdB
-
Export Gantt View
I'd like to be able to print the Gantt view alongside the Structure View. The time can be shortened into 1 column and show start and finish dates alongside the list, the same way it is on the page but in the printed view.
6 votesThis feature is now available as a part of Structure.Gantt 1.2 release.
-
Documentation Update - How to create a new Formula Column
The Structure 4.5 documentation doesn't identify how to create a NEW Formula Column.
https://wiki.almworks.com/display/structure/Formula+ColumnStep 1 should identify how to add a new field, not how to write the formula.
1 vote -
Enhance Visuals
Enhance the visualization by adding the possibility to group tasks by boxing them. The grouping effect should be configurable per issue type (color and on/off)
Only 7 Days available...
1 voteWith release of Structure.Gantt 1.3 it is now possible to have different configurations/colors for different set of issues, please see release notes for more details: https://wiki.almworks.com/x/kR50Aw
-
Gantt resource view should better callout what the numbers mean
So lets say that I'm new to Structure.Gantt.
When I see the resource view, I see a bunch of numbers for each resource line item. Of course I can assume that these are the hours allocated to each individual on a daily basis, but there is no indication of that being the case without playing with the Gantt chart, which effects others tasks.
It may seem like such a minor thing, but for people who are new to resource planning or have experienced resource planning in other tools understanding what those numbers mean is important.
1 voteWith introduction of Structure.Gantt 1.4 it is now possible to choose whatever allocation is shown in Hours or Percents, see here for more details: https://wiki.almworks.com/x/1rS9Aw
-
Show values for field "Issue type" now it shows only pics
Some times you have different names for issue types but they have one shared pic or it is 20 issue types in project. When we build a structure we want to know what is a issue type for an issue (how it names).
Now it shows only pics. We tested "translation" for issue types, thaought the problem may be in it, but the test showed that it does not depend on "Translation".
1 voteThank you for the idea and check the comment, please!
-
Toggle to expand or collapse all
It would save time if there was the option to expand or collapse all in the JIRA structure.
1 votePlease see the comment!
-
Enable Colums to show sum of person days (eg. 101 days) instead of "20w 1d" notation
As one usually plans on higher levels in bigger amounts of "man days", it would be very helpful to be able to change the columns to this notation for the days and sums of days.
I know one can change that in the jira administration, but this would affect the whole instance and also smaller issue levels.0 votes -
Add tooltips to show complete field content
I would like to be able to see, for example, the complete name of an issue in a tooltip because sometimes the width of a column is not enough to show the whole content of a field.
1 vote -
group by date range
I would like to be able to group by 'due date' ranges. This would allow me to group tasks by milestones. In my case I would like to be able to group by quarter.
1 voteAvailable in Structure 4.0 – see comments for details.
-
With Structure 3.x, it would be nice to be able to minimize the Header Tool Bar to give more real estate to the Structure
With Structure 3.x, there's too much space in the header now leaving almost half the screen for the Structure. It would be nice to be able to minimize the header tool bar like JIRA Agile allows.
Also, it would be good to minimize the Transformations tool bar with the quick filters selected still active. Currently, you have to click X to the right of the Transformations tool bar which deselects the highlighted transformations.
3 votes -
Show hours worked filtered by worklog author
It would be very helpful to be able to use Structure to display hours worked on issues, filtered by the author of each worklog.
34 votes -
Develop Structure plugin for JIRA cloud version
Considering nowadays users want to use in cloud circumstances, why don't you develop Structure plugin for JIRA cloud? I can't find any other project management tools than Structure. Any plans?
38 votes
- Don't see your idea?